Place of Origin: | China |
---|---|
Brand Name: | TITAN |
Certification: | CE/BV/CCC/SGS |
Model Number: | Equipment trailer |
Minimum Order Quantity: | 1 UNIT |
Price: | Negotiable |
Packaging Details: | Naked, waxing on RORO or Bulk Ship or by 40GP, 40HQ,40FR |
Delivery Time: | 25 working days |
Payment Terms: | L/C, D/A, D/P, T/T |
Supply Ability: | 500 unit per month |
Model: | Low Bed Semi Trailer | Capacity: | 60-120 Ton |
---|---|---|---|
Length: | Customizable | Axles: | 2/3/4/5/6 Axles |
Landing Gear: | JOST | Material: | Steel |
Use: | Truck Trailer | Suspension: | Mechanical / Air / Single Point Suspension |
King Pin: | 90#/50# | Function: | Transport Heavy Equipments |
Low bed Trailer can have a variety of models, such as drop deck / step deck trailers, 2axle,3axle,4axle lowbed semi trailer,hydraulic ladder lowbed semi trailer, mechanical ladder and so on. This semi-trailer normally is used to transport large construction machinery,such as excavators, rollers and cranes.
TITAN Low loader trailers have different capacities, such as 40 tons, 50 tons, 70 tons, 80 tons and 100 tons, 120 tons, 150 tons. Each type uses the different number of axles from 2, 3, 4 axles to 7, 8 axles.
We use high strength steel material to ensure the tri axle drop deck trailer for sale loading capacity, the load can be up to 60 to 100 ton payload.
Tri axle drop deck trailer adopt famous brand parts, like WABCO braking valve, JOST legs, FUWA, BPW axles. It will ensure the long service life of the drop deck trailer for sale.
1. Connect side beams, welding king pins
At this time, the main beam is basically formed, only the side beams are welded to form the frame structure. And the traction pin traction plate is welded to the position required in the contract, the welding process is required to be high, otherwise the lowbed trailer will be skewed.
2. Submerged arc welding beams, beams fixed
The second step is to fix the cut web and the upper and lower wing plates to weld points, and then weld the beam by submerged arc welding.
3. Opening, calibration beam, through beam
First cut out the web of the beam to cut out U-shaped holes through which the beams can pass, and then fix the welded I-beams in parallel. The result of comparing the beams is very important. If two I-beams have large parallel errors, very serious tire wear will occur.
4. Stage of cutting steel sheet material
According to the drawings of each part produced by the design department, each part is cut out with a CNC cutting machine, such as beam webs, reinforcement plates, standard small accessories and so on.
5. Welding frame, welding suspension
At this time, the welding suspension must strictly control the size and maintain the squareness, otherwise it will cause 2 axle low loader for sale of tire wear.
Brand | TITAN Lowbed Trailer |
Overall dimension | 13000*3000*3400mm |
Loading capacity | 80-150 Ton |
Axle | 3/4/5/6 axles |
Suspension | Heavy duty mechanical spring suspension |
Tire | 12/16/20/24 units |
Landing gear | JOST |
Brake system | WABCO |
Kingpin | 90# |
Electrical system | 24V, LED lights |
Load test before shipment
Welcome to the inquire! Please fill in your contact information and suggestions! Thank you!